中文Get a Quote

Crane Load Testing: Ensuring Safety and Reliability

Discover the critical requirements for crane load testing to ensure safety and reliability. Learn about proof load tests and why they are essential.

Overview

Discover the critical requirements for crane load testing to ensure safety and reliability. Learn about proof load tests and why they are essential. This guide covers parameters, selection, common failures and a buyer checklist for Load Test & Certification.

Key Parameters

ParameterTypical rangeNote
静载1.25 倍额定主梁下挠不超规
动载1.1 倍额定各机构运转变速正常
标准GB/T 5905 / ISO 9934(NDT) / FEM出口按目的国
取证监督检验合格证+使用登记特种设备流程
出口文件CE/EAC + 俄/英文说明书+护照目的国要求

Typical Applications

Commonly used in: 新机安装验收、定期检验、出口发货前的载荷试验与取证. Requirements for span, duty class and protection vary a lot by site — always specify against your real duty.

Selection Steps

Common Failures & Fixes

主梁下挠超

级别低/超载;加固或降级。

机构异响

装配/润滑;复调。

Buyer Checklist

FAQ

静载动载多少?

静 1.25×、动 1.1× 额定。

出口要什么证?

CE(欧盟)/EAC(俄白哈)/第三国按规;配俄英文说明书。

试验谁做?

有资质特检院/第三方,出厂前厂内先自检。

周期?

安装后首检,定期(一般 2 年)定检。

Why Tongyu / Henan Lugang

Factory-direct, CE/ISO9001, non-standard design to drawing, global shipping with on-site guidance and load test. Tell us your capacity, span and site condition — 【SPEC: your real EAC certificate status / lead time / price range】 — and we return an itemised quotation within 24 hours. Request a quotation →

Request a quotation →